The tooling leadtime you provided for example is 30 days does it include all stages of 1st shot, fine tune, revised, etc?
各位大大幫我看下tooling leadtime 和1st shot, fine tune在這里面是什么意思呢?謝謝
Tooling leadtime refers to the time it takes to complete the production and manufacturing of a tool or mold for a specific product. It includes all the stages involved in the tooling process such as design fabrication, testing, and final adjustments.
In the context of your question, "1st shot" refers to the initial production run using the newly created tool or mold. It is typically done to test the tool's functionality and the quality of the product. "Fine tune" refers to the process of making adjustments or modifications to the tool or mold based on the results of the first production run. This is done to optimize the efficiency and quality of the tooling process.
So, the tooling leadtime of 30 days that you mentioned should include all the stages, including the 1st shot and any necessary fine-tuning or revisions.
tooling leadtime 一般指模具的交期 也就是從設(shè)計(jì)到模具完全OK的時(shí)間
1st shot指第一次試模 一般也稱為: FOT: first of tool
Fine tune 應(yīng)該是修模
客人的意思是說你們30天的模具交期里面有沒有包含第一次試模,修模,模具變更等的時(shí)間